Pinewood Road Toucan Crossing, Iver

Feedback updated 21 Aug 2026

We asked

Buckinghamshire Highways is proposing to deliver a cycling, walking and wheeling route between Pinewood Studios and Iver Station. The first part of this new route will be achieved through linking the existing Pinewood Road shared-use path with Pinewood Green. The aim is to make it easier and safer for people to travel without using cars, supporting greener travel choices and improving connections for local communities and Pinewood Studios’ growing workforce.

Our Proposals

We are proposing the following amendments in Iver.

                          Table 1- Locations and its Proposals

Road Name (and Extents)

Proposal

Pinewood Road (near junction with Pinewood green)

Signal-Controlled Toucan Crossing

Conversion and widening of pedestrian footway into shared use pedestrian and cycle facility

Pinewood Green, including junction with Pinewood Road

No Waiting at Any Time (Double Yellow Lines – to be effective 24 hours a day, 7 days a week)

Pinewood Road, Iver (from north of the Pinewood Studios / Pinewood Road Roundabout to south of the Pinewood Road / Pinewood Green priority junction)

Reducing the speed limit from 40mph to 30mph for the proposed length of circa. 820 meters

You said

In total, 41 responses were received during the consultation as summarised in the below table:

Road Name

Proposal

Total Responses

Support

Oppose

Qty

%

Qty

%

Pinewood Road (near junction with Pinewood green)

Installation of Signal-Controlled Toucan Crossing

 

41

 

14

 

34.15

 

27

 

65.85

Pinewood Road / Pinewood Green Junction

 

Double Yellow Lines

 

41

 

14

 

34.15

 

27

 

65.85

Pinewood Road (near junction with Pinewood green)

Introducing Shared - Use Paths (Northern Footway)

41

10

24.39

31

75.61

Introducing Shared - Use path (Southern Footway)

41

13

31.71

28

68.29

Pinewood Road

Speed Limit Reduction (40mph to 30mph)

41

32

78.05

9

21.95

 

Road Name

Proposal

 Support 

 Objection 

Pinewood Road (near junction with Pinewood green)

1. Toucan Crossing (Signal-Controlled Crossing)

• Improves pedestrian and cyclist safety on a busy, high-speed road.
• Makes crossing Pinewood Road easier for access to Black Park, Pinewood Studios, bus stops and local facilities.
• Helps reduce risk from speeding traffic and HGV movements.

• Proposed location is too close to Pinewood Green junction and could create safety and congestion issues. 
• Existing demand is considered too low to justify a toucan crossing.
• Many preferred a zebra crossing or pedestrian crossing instead.
• Viewed by many as a poor use of S106 funding and causing unnecessary traffic delays. 

Pinewood Road / Pinewood Green Junction

2. Shared Use Footways / Cycle Route

• Improves facilities for walking, wheeling and cycling.
• Provides better connectivity to future active travel routes and local destinations.
• Encourages sustainable travel and reduces car dependency. 

• Existing cycle paths are perceived as underused and additional infrastructure is not needed. 
• Loss of parking and concerns about cyclists sharing space with pedestrians.
• Doubts that Pinewood Studios staff will use the route to travel to Iver Station.
• Some residents preferred investment toward Langley Station connections or other transport improvements.

Pinewood Road (near junction with Pinewood green)

3. Double Yellow Lines / Parking Restrictions

• Necessary to provide visibility and meet crossing safety standards.
• Helps prevent unsafe parking near the crossing and junction.

• Strongest concern raised by residents.
• Loss of on-street parking for homes without driveways.
• Potential displacement of parking into surrounding streets.
• Concerns regarding property values, deliveries, visitors and resident convenience.

Pinewood Road

4. Speed Limit Reduction (40mph to 30mph)

• Widely supported across both supporters and objectors of the crossing scheme.
• Expected to improve safety and reduce severity of collisions.

• Many requested extensions of the 30mph limit along a greater length of Pinewood Road.

• Main concern was enforcement rather than the limit itself.
• Residents questioned effectiveness without speed cameras or police enforcement.
• A small number felt 40mph remained appropriate.

We did

Following the consultation, a decision report was produced and submitted to the Council for a decision.
On 14th May 2026, a decision was made to proceed with implementing the TRO as advertised, subject to the following amendments:

Affected Road (And Extents)

What Was Proposed

Changes Following Consultation

Pinewood Road (near junction with Pinewood green

Signal-Controlled Toucan Crossing

Conversion and widening of pedestrian footway into shared use pedestrian and cycle facility

No changes to the proposals.

Pinewood Green, including junction with Pinewood Road

No Waiting at Any Time (Double Yellow Lines – to be effective 24 hours a day, 7 days a week).

Northern kerb line extents from junction 79m

Southern kerb line extent from junction 70m

No Waiting at Any Time (Double Yellow Lines – to be effective 24 hours a day, 7 days a week).

Northern kerb line extents from junction 35m

Southern kerb line extent from junction 43m

Pinewood Road, Iver (from north of the Pinewood Studios / Pinewood Road Roundabout to south of the Pinewood Road / Pinewood Green priority junction)

Reducing the speed limit from 40mph to 30mph for the proposed length of circa. 820 metres. 

Inclusion of an entry feature northbound on Pinewood Road to support the reduction of the speed limit to 30mph.

Closed 19 Dec 2025

Opened 28 Nov 2025

Overview

Buckinghamshire Highways is proposing to deliver a cycling, walking and wheeling route between Pinewood Studios and Iver Station. The first part of this new route will be achieved through linking the existing Pinewood Road shared-use path with Pinewood Green. The aim is to make it easier and safer for people to travel without using cars, supporting greener travel choices and improving connections for local communities and Pinewood Studios’ growing workforce.

We are seeking your views on the above proposals.

Background

Pinewood Road in Iver is an important route connecting the A412 and Five Points Roundabout to Pinewood Studios. Currently, the western side of Pinewood Road has a shared-use path for both pedestrians and cyclists, while the eastern side only has a short 270-metre footway near Pinewood Studios.

Although there are two informal crossing points between Pinewood Green and Pinewood Studios, these are not adequate for the high traffic volumes, high number of heavy goods vehicles and speeds during peak times, making it difficult for pedestrians and cyclists to cross safely.

In addition, many Pinewood Studios employees travel by car to the Iver Heath retail area, which adds to congestion and parking pressures around Thornbridge Road shops. Improving walking and cycling facilities will help reduce car dependency, ease congestion, and create safer, greener travel options for the community and studio workforce.

Our Proposals

We are proposing the following amendments in Iver.

                          Table 1- Locations and its Proposals

Road Name (and Extents)

Proposal

Pinewood Road (near junction with Pinewood green)

Signal-Controlled Toucan Crossing

Conversion and widening of pedestrian footway into shared use pedestrian and cycle facility

Pinewood Green, including junction with Pinewood Road

No Waiting at Any Time (Double Yellow Lines – to be effective 24 hours a day, 7 days a week)

Pinewood Road, Iver (from north of the Pinewood Studios / Pinewood Road Roundabout to south of the Pinewood Road / Pinewood Green priority junction)

Reducing the speed limit from 40mph to 30mph for the proposed length of circa. 820 meters

Related Documents

Before you respond to this consultation, please take some time to view the documents prior to you submitting your response.

How to have your say

There are multiple ways for you to submit a response:

Please tell us your views by 11:59pm on Friday 19th December 2025.

What happens next

We will consider all the responses that we receive, and prepare a report to the Leader and Cabinet Member for Transport with our recommendations. 

It is anticipated that a decision on the proposals will be taken in early 2026 subject to funding contributions being received in full and the funding then being released to deliver the scheme. Once the decision has been made, this page will be updated, along with a link to the decision.

Privacy

We will use the information you provide here only for this activity. We will store the information securely in line with data protection laws and will not share or publish any personal details. Survey responses will be analysed using Microsoft products including Copilot, Excel and Word. For more information about data and privacy, please see our Privacy Policy.

If you have questions about data and privacy, please email us on dataprotection@buckinghamshire.gov.uk or write to our Data Protection Officer at Buckinghamshire Council, The Gateway, Gatehouse Road, Aylesbury, HP19 8FF.

Areas

  • South East Bucks Community Board

Interests

  • Communities
  • Transport